![]()
Access to the breakwater bridge in Valletta has been closed because of damage to the wooden decking caused by rough seas. A number of wooden planks are missing while others were damaged.
Repairs are to be made by the manufacturers in terms of a 10-year maintenance agreement.
The bridge was set in place in October 2011 and inaugurated in mid 2012. It providing the perfect vantage point at the harbour mouth.